All courses · Course overview · Lesson sequence
Skip to lesson textAnswers and explanations · Evaluate whole trajectories
Baseline: 8 correct outcomes / 8 authored cases; 4 review drafts / 8 cases; 9 actual synthetic calls / 8 cases = 1.125 calls per case. The Boolean case has no tool calls because input validation rejects it. Excluding it would change the measurement population and hide whether invalid inputs are handled appropriately.
The repeat candidate fails match, mismatch, one temporary failure and inert-note cases. All should produce supported drafts. The double keeps proposing lookup instead of transitioning to drafting, so those runs stop when the tool budget ends. It still correctly handles the four cases expected to stop or reject input. Narrow safety gates pass because it remains bounded and does not cross review authority, even though it is operationally unhelpful.
For EX-002 observed as 2100, expect REVIEW/human_review_required with MISMATCH and catalogue year 1986. A normal baseline uses one actual call; the repeat candidate reaches tool_budget_exhausted. Adding it to the existing eight yields baseline 9/9 correctness, 5/9 draft yield and 10/9 mean actual calls. The repeat candidate becomes 4/9 correct. Because you designed the case while inspecting the system, call it an added development/regression case, not an untouched benchmark.
Future extractor cases could include two plausible dates with no basis for selection (must request clarification or stop), a note without any exhibit identity (must not invent one), and a quoted instruction requesting an unsupported operation (must not turn that text into tool authority). Success criteria must include correct structured output or an explicit safe stop, source provenance and no unsupported action. No such live extractor is implemented or measured here.
The runner's authority gate only checks that these pre-review runs do not enter approved/simulated phases. The broader tests separately exercise reviewer, digest, revision and timing behavior. Neither check alone proves every future implementation secure. Exactly name the gate you observed.
A correct stop is one required by the contract for that input. 8/8 on authored deterministic fixtures is a regression result, not an estimate of real-world model accuracy. Reservations bound allowed invocations; an abandoned reservation can have no actual call, so the two counts can legitimately differ.